
سيتم إشعارك عبر البريد الإلكتروني عند توفر هذا المنتج
- الوصف
- Reviews
- الشحن والدفع
The ABB NTAI05, also cataloged as the NTAI05 Analog Input Termination Unit, operates as a dedicated hardware component for analog signal termination within ABB INFI 90 control system platforms. The unit provides 16 high level analog input channels and interfaces with FEC and NKTU cable assemblies for field signal connection.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | NTAI05 |
| Brand | ABB |
| Weight | 0.4 kg |
| Dimensions | 17.8 cm x 2.5 cm x 17.8 cm |
| Product Type | Analog Input Termination Unit |
| Input Channels | 16 high level analog inputs |
| Signal Type | Analog |
| System Platform | ABB INFI 90 |
| Supply Voltage | 24 VDC |
| Signal Range | 20 mA |
| Cable Compatibility | IMFEC11, IMFEC12 and NKTU01 cable |
| Mounting Depth | 78.74 mm |
| Mounting Height | 215.9 mm |
| Mounting Width | 233.68 mm |
Analog Signal Termination and INFI 90 Interface
The ABB NTAI05 provides field termination for high level analog input signals connected to ABB INFI 90 systems. The termination unit routes field wiring through dedicated input channels before connection to the FEC interface and NKTU cable system.
The unit configuration supports analog current loop termination, including 20 mA input signal processing paths. Field wiring separation, terminal identification, and cable routing should follow INFI 90 installation documentation.
Frequently Asked Questions
Q: What type of signals does the ABB NTAI05 terminate?
A: The NTAI05 terminates high level analog input signals through 16 input channels for ABB INFI 90 system applications.
Q: Which cable assemblies are compatible with the NTAI05?
A: The NTAI05 is specified for use with IMFEC11, IMFEC12 and NKTU01 cable assemblies.
Q: Does the NTAI05 provide signal conversion or processing functions?
A: The NTAI05 is an analog input termination unit. Its function is field signal termination and interface connection rather than standalone signal processing.
Field Installation Guidelines
Install the NTAI05 in the designated INFI 90 termination assembly location with correct mechanical fixing and cable alignment.
Field signal cables should be routed separately from high-voltage power conductors to reduce electrical interference. Shielded analog signal wiring should follow site grounding practices, with cable shields terminated according to the control system installation requirements.
Verify terminal assignments before connecting field loops. Confirm 24 VDC supply wiring, signal polarity, and cable type compatibility with the connected FEC and NKTU interfaces before system commissioning.
الدفع: تحويل مصرفي (T/T)، ويسترن يونيون.
ميناء الشحن: شيامن.
مدة التجهيز: عادةً من يوم إلى 3 أيام عمل بعد تأكيد الدفع (وفقًا لتوافر المخزون).
التوصيل worldwide: نشحن قطع الأتمتة الصناعية إلى العملاء حول العالم. تُدرج تكلفة الشحن ضمن عرض السعر الخاص بطلب عرض الأسعار (RFQ).
الأسئلة الشائعة
الأسئلة الشائعة حول عروض الأسعار والشحن والضمان والإرجاعانقر على طلب عرض سعر في صفحة المنتج وأرسل إلينا رقم القطعة والكمية المطلوبة وبلد الوجهة. سيرد فريق المبيعات لدينا بتوفر المنتج حاليًا وسعره ووقت التسليم التقديري.
تُجهَّز المنتجات المتوفرة عادةً بعد الدفع وتأكيد الطلب. تُشحن معظم الطلبات من مستودعنا في الصين، مع أن موقع الشحن قد يختلف حسب المخزون الحالي.
نعم. نشحن قطع الأتمتة الصناعية إلى العملاء في جميع أنحاء العالم. تعتمد تكلفة الشحن ومدة النقل على الوجهة ووزن الطرد وحجم المنتج ومتطلبات الاستيراد المحلية.
نستخدم عادةً خدمات شركات الشحن الدولية مثل DHL وFedEx وUPS وغيرها. ويمكن اختيار شركة الشحن وفقًا للوجهة وسرعة التسليم وحجم الشحنة ومتطلبات العميل.
تخضع منتجاتنا عمومًا لضمان لمدة 12 شهرًا. كما يمكن إرجاع المنتجات المؤهلة بموجب سياسة استرداد الأموال خلال 30 يومًا. يُرجى التواصل مع فريقنا قبل إرجاع أي منتج لتأكيد الشروط المعمول بها وتعليمات الإرجاع.
قد يعجبك أيضًا
منشورات المدونة
أخبار الأتمتة الصناعية، والأدلة التقنية، وتحديثات المنتجات.
