
Notified by email when this product becomes available
- Description
- Reviews
- Shipping & Payment
The ABB REG670 (REG670 Generator Protection IED) provides generator, prime mover, and generator-transformer protection through CT/VT measurement inputs, binary I/O, protection algorithms, and station communication interfaces within the ABB Relion 670 Series.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | REG670 |
| Brand | ABB |
| Product Series | Relion 670 Series |
| Product Type | Generator Protection IED |
| Application | Generator, prime mover, and generator-transformer protection |
| Analog Inputs | Up to 24 CT/VT universal analog input channels |
| Binary I/O | Expandable to 100+ digital inputs and output relays |
| Auxiliary Power Supply | 24-60 VDC, 90-250 VDC / 100-240 VAC, variant dependent |
| Differential Operating Time | Approximately 15 ms typical |
| Measurement Accuracy | Current/Voltage Class 0.2; active/reactive power Class 0.5 |
| Communication Protocols | IEC 61850-8-1, IEC 60870-5-103, DNP3, Modbus RTU/TCP, LON, SPA |
| Ethernet Interfaces | Optical LC or RJ45; PRP/HSR supported |
| Operating Temp | -40 deg C to +70 deg C |
| Enclosure | 1/2, 3/4, or 1/1 19-inch rack mounting case |
| Front Protection | IP54 |
| Engineering Tool | PCM600 |
Generator Protection and Measurement Functions
REG670 integrates protection functions for the generator electrical zone and associated generator-transformer equipment. Up to 24 CT/VT analog inputs can support combined main and backup protection functions in one IED.
Generator differential protection provides a typical operating time of approximately 15 ms for internal phase-to-phase and phase-to-earth faults. The protection architecture can also support duplicated Main 1 and Main 2 protection functions when the selected hardware and configuration provide the required redundancy.
For stator earth-fault protection, REG670 supports injection-based 100% coverage and 3rd harmonic-based protection. Injection can be implemented through a neutral-point VT or an open-delta VT at the generator terminals. Rotor earth-fault monitoring uses an injection principle to assess field-winding insulation relative to ground.
REG670 also provides integrated sub-synchronous resonance protection for applicable turbo-generator configurations, using filtering and protection algorithms associated with shaft torsional behavior.
IEC 61850 and Station Communication
The IED supports IEC 61850-8-1 Edition 1 and Edition 2 together with IEC 60870-5-103, DNP3, Modbus RTU/TCP, LON, and SPA interfaces. Ethernet interfaces can use optical LC or RJ45 connections. PRP and HSR functions provide redundant Ethernet network paths when supported by the selected hardware configuration.
Frequently Asked Questions
Q: What measurement inputs are available on REG670?
A: The supplied specification identifies up to 24 universal CT/VT analog input channels per unit, with expandable binary inputs and output relays.
Q: What is the typical operating time of the generator differential protection?
A: The supplied data specifies approximately 15 ms typical operating time for the differential protection function.
Q: Can REG670 provide duplicated main protection functions?
A: Yes. The supplied documentation states that the hardware can accommodate duplicated protection functions for Main 1 and Main 2 configurations, subject to the selected configuration.
Field Installation Guidelines
Mount the REG670 in the specified 19-inch rack configuration and provide mechanical clearance appropriate to the selected enclosure. Confirm the exact hardware variant before wiring the auxiliary supply because the supported DC and AC voltage ranges are variant dependent.
Terminate CT and VT circuits according to the protection scheme and verify polarity, phase identification, and circuit continuity before energization. CT secondary circuits must be handled according to applicable protection-system safety procedures.
Separate power, CT/VT, binary I/O, and communication wiring where practical to reduce electromagnetic coupling. For Ethernet communication, use the specified LC optical or RJ45 interface and apply the required PRP or HSR network topology when redundancy is configured.
Connect protective earth and cabinet bonding according to the installation design. Verify the selected communication protocol, IED addressing, IEC 61850 configuration, and PCM600 project configuration before commissioning.
Payment: T/T, Western Union.
Shipping port: Xiamen.
Lead time: Typically 1–3 working days after payment confirmation (subject to stock).
Worldwide delivery: We ship industrial automation parts to customers around the world. Freight is quoted with your RFQ.
F.A.Q.
Common questions about quotes, shipping, warranty and returnsClick Request a Quote on the product page and send us the part number, required quantity, and destination country. Our sales team will reply with current availability, pricing, and estimated delivery time.
In-stock items are normally prepared after payment and order confirmation. Most orders are dispatched from our warehouse in China, although the shipping location may vary depending on current stock.
Yes. We ship industrial automation parts to customers worldwide. Shipping cost and transit time depend on the destination, package weight, product size, and local import requirements.
We commonly use DHL, FedEx, UPS, and other international courier services. The carrier can be selected according to the destination, delivery speed, shipment size, and customer requirements.
Our products are generally covered by a 12-month warranty. Eligible products may also be returned under our 30-day refund policy. Please contact our team before returning any item to confirm the applicable terms and return instructions.
You may also like
Blog Posts
Industrial automation news, technical guides, and product updates.
