
Bu ürün stokta olduğunda e-posta ile bilgilendirileceksiniz
- Açıklama
- Reviews
- Kargo ve Ödeme
The ABB DAI01, also cataloged as the DAI01 Analog Input Module, operates as a dedicated hardware component for multi-channel analog signal acquisition within ABB Freelance rack I/O systems. It conditions 16 independent direct-current loops to convert field variable measurements into digitized system variables for distributed control processing.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | DAI01 |
| Brand | ABB |
| Origin | Sweden |
| Weight | 1.7 kg |
| Dimensions | 20.3 cm x 5.1 cm x 33.0 cm |
| Operating Temp | 0 to 55 deg C |
| Power Consumption | 5 W nominal |
| Input Channels | 16 single-ended current inputs |
| Signal Range | 0-20 mA / 4-20 mA |
| Resolution | 12-bit (4096 steps) |
| LSB Step Size | ~=5.5 uA nominal |
| Input Resistance | 50 Ohm |
| Compatible Cables | 0336333, 0336334 |
System Backplane Bus & Network Integration
The module interfaces directly with the proprietary ABB Freelance rack backplane, operating at optimized backplane bus communication velocity to ensure deterministic data transfer to the active rack controller. High-density I/O scaling allows 16 discrete process loops to be processed without introducing communication latencies. Firmware flash compatibility checks are enforced by the rack head station upon insertion to ensure physical slot assignments align with system configuration parameters.
Frequently Asked Questions
Q: Is the ABB DAI01 directly interchangeable with ABB DAI03 or DAI05 modules?
A: No. The DAI01 utilizes a fixed 50 Ohm input resistance and internal signal conditioning designed specifically for legacy Freelance rack backplanes, whereas DAI03 and DAI05 feature different internal impedances and circuit topologies.
Q: What system cables are certified for field terminal block connections on the DAI01?
A: System interconnects must use certified ABB cable part numbers 0336333 or 0336334 to ensure signal integrity and proper backplane pin alignment.
Field Installation Guidelines
- Ensure backplane power is disconnected before rack insertion or extraction to prevent edge-connector damage, as hot-swapping behavior depends on rack frame capabilities.
- Maintain a minimum bend radius for cable harnesses 0336333 and 0336334 to prevent mechanical stress on the front connector pin assembly.
- Route 4-20 mA current loop wiring in dedicated grounded conduit away from high-voltage AC motor drives to minimize inductive coupling.
- Connect overall shield drain wires to the designated system functional earth (FE) ground bus at one end only to prevent ground loop currents.
Ödeme: T/T, Western Union.
Sevkiyat limanı: Xiamen.
Teslim süresi: Ödeme onayından sonra genellikle 1–3 iş günü (stok durumuna bağlıdır).
Dünya genelinde teslimat: Endüstriyel otomasyon parçalarını dünyanın dört bir yanındaki müşterilerimize gönderiyoruz. Nakliye ücreti, RFQ’nuzla birlikte teklif edilir.
Sıkça Sorulan Sorular
Teklifler, gönderim, garanti ve iadeler hakkında sık sorulan sorularÜrün sayfasında Teklif İste seçeneğine tıklayın ve parça numarasını, gereken miktarı ve varış ülkesini bize gönderin. Satış ekibimiz güncel stok durumu, fiyatlandırma ve tahmini teslimat süresiyle size yanıt verecektir.
Stokta bulunan ürünler normalde ödeme ve sipariş onayından sonra hazırlanır. Çoğu sipariş Çin'deki depomuzdan gönderilir; ancak gönderim konumu mevcut stoğa bağlı olarak değişebilir.
Evet. Endüstriyel otomasyon parçalarını dünya genelindeki müşterilere gönderiyoruz. Kargo ücreti ve taşıma süresi; varış noktasına, paketin ağırlığına, ürünün boyutuna ve yerel ithalat gerekliliklerine bağlıdır.
Genellikle DHL, FedEx, UPS ve diğer uluslararası kurye hizmetlerini kullanıyoruz. Taşıyıcı; varış noktasına, teslimat hızına, gönderi boyutuna ve müşteri gereksinimlerine göre seçilebilir.
Ürünlerimiz genel olarak 12 aylık garanti kapsamındadır. Uygun ürünler ayrıca 30 günlük para iade politikamız kapsamında iade edilebilir. Uygulanabilir koşulları ve iade talimatlarını teyit etmek için lütfen herhangi bir ürünü iade etmeden önce ekibimizle iletişime geçin.
Bunlar da ilginizi çekebilir
Blog Gönderileri
Endüstriyel otomasyon haberleri, teknik kılavuzlar ve ürün güncellemeleri.
